What's In My Cart?

Product(s)

tail pitch slider 6mm tail pitch slider 6mm

   oder löschen
44,00 €
incl. 19% Tax plus shipping
upper right side frame CF upper right side frame CF

   oder löschen
49,50 €
incl. 19% Tax plus shipping
distance bush for mainshaft distance bush for mainshaft

   oder löschen
3,50 €
incl. 19% Tax plus shipping
battery plate double battery battery plate double battery

   oder löschen
23,00 €
incl. 19% Tax plus shipping
landing bows pair CF landing bows pair CF***

   oder löschen
46,00 €
incl. 19% Tax plus shipping
Y-cable for Exp-modules Y-cable for Exp-modules

   oder löschen
4,50 €
incl. 19% Tax plus shipping
foil tail fin Diabolo 600

   oder löschen
6,00 €
incl. 19% Tax plus shipping
skid (2) skid (2)

   oder löschen
13,00 €
incl. 19% Tax plus shipping
ESC platform YGE Aureus ESC platform YGE Aureus

   oder löschen
14,00 €
incl. 19% Tax plus shipping
tailboom holder clamp tailboom holder clamp

   oder löschen
19,50 €
incl. 19% Tax plus shipping
tailrotorhub 6 mm tailrotorhub 6 mm

   oder löschen
19,50 €
incl. 19% Tax plus shipping
spacer for support eyelet (2) spacer for support eyelet (2)

   oder löschen
2,50 €
incl. 19% Tax plus shipping
tailboom 700 UL

   oder löschen
34,50 €
incl. 19% Tax plus shipping
blade grip blade grip

   oder löschen
26,00 €
incl. 19% Tax plus shipping

Netto Price: 256,72 €

VAT: 48,78 €

Sub-Total: 305,50 €

Products marked with *** dont exist in desired quantity in our stock.
Please alter the quantity of products marked with (***), Thank you

Continue Shopping Checkout

Shipping flat rate on payment method Advanced Payment

Germany 7,00 EUR
EU 19,- EUR

Shippingcosts on payment method Receipt or Paypal

Germany: Depending on complexity, between 1,50 EUR and 7,00 EUR.
Note: On shop orders a software related flat price of 7,00 EUR will be calculated, which is will be adjusted by us to the the real cost.

EU: Depending on complexity, between 2,- EUR and 19,- EUR.
Note: On shop orders a software related flat price of 19,- EUR will be calculated, which is will be adjusted by us to the the real cost.