What's In My Cart?

Product(s)

front U-profile front U-profile

   oder löschen
15,50 €
incl. 19% Tax plus shipping
bearing block elevator servo bearing block elevator servo

   oder löschen
6,50 €
incl. 19% Tax plus shipping
control rod 2.5 x 12 (2) control rod 2.5 x 12 (2)

   oder löschen
2,00 €
incl. 19% Tax plus shipping
tail blade grip black tail blade grip black

   oder löschen
20,50 €
incl. 19% Tax plus shipping
gyro platform CF gyro platform CF

   oder löschen
10,00 €
incl. 19% Tax plus shipping
rubber grommet servo cable rubber grommet servo cable

   oder löschen
1,00 €
incl. 19% Tax plus shipping
freewheel unit freewheel unit***

   oder löschen
68,00 €
incl. 19% Tax plus shipping
pinion 10T electric pinion 10T electric

   oder löschen
16,50 €
incl. 19% Tax plus shipping
dampening ring (2) dampening ring (2)

   oder löschen
1,50 €
incl. 19% Tax plus shipping
front canopy mount front canopy mount

   oder löschen
3,50 €
incl. 19% Tax plus shipping
motor shaft bearing block motor shaft bearing block

   oder löschen
12,50 €
incl. 19% Tax plus shipping
joint bolt M3x9 (2) joint bolt M3x9 (2)

   oder löschen
4,20 €
incl. 19% Tax plus shipping
connector 110° (2) connector 110° (2)

   oder löschen
5,00 €
incl. 19% Tax plus shipping
freewheel hub unit freewheel hub unit***

   oder löschen
68,00 €
incl. 19% Tax plus shipping

Netto Price: 197,22 €

VAT: 37,48 €

Sub-Total: 234,70 €

Products marked with *** dont exist in desired quantity in our stock.
Please alter the quantity of products marked with (***), Thank you

Continue Shopping Checkout

Shipping flat rate on payment method Advanced Payment

Germany 7,00 EUR
EU 19,- EUR

Shippingcosts on payment method Receipt or Paypal

Germany: Depending on complexity, between 1,50 EUR and 7,00 EUR.
Note: On shop orders a software related flat price of 7,00 EUR will be calculated, which is will be adjusted by us to the the real cost.

EU: Depending on complexity, between 2,- EUR and 19,- EUR.
Note: On shop orders a software related flat price of 19,- EUR will be calculated, which is will be adjusted by us to the the real cost.